![]() ![]() |
|
![]() Five Step Process |
1. Pipe is unloaded from the trucks and onto a hydraulic controlled pipe movement rack system.
|
2. Pipe is moved into the slotting machines.
|
3. Pipe is slotted.
|
4. Pipe is moved to the cleaning station with the same hydraulic system and overhead crane.
|
5. Pipe is stored in the yard.
|